Friday, 8/19/2022

Took a load of pottery to the VAC Gallery.

Picked up 100 lbs. Bmix and 100 lbs. Death Valley clays from High Fire Hawaii.

Wednesday, 8/17/2022

Unloaded the Bailey glaze kiln and still have pinhole problems with the Torquoise Matt glaze especially on the plates. Firing was neutral to moderately oxidized which was expected as I didn’t apply reduction at the end of the firing.

Loaded up the Bailey kiln for another glaze firing .

Front Row 8/15/2022 firing
Back row 8/15/2022 firing

Monday, 8/15/2022

Fired the Bailey glaze kiln in 13 hours & 35 minutes with no reduction applied at the end. Used 14% propane to fire cone 10 down and then 10 minutes longer before turning off.