Finished glazing and will load the Bailey glaze kiln tomorrow after unloading the glaze kiln.
Sunday, 5/15/2022
Fired the Bailey glaze kiln in 12 hours with a 20 minute reduction at the end. Used 13% propane. Thermocouple on the pyrometer failed near the end of the firing (1 wire corroded and broken inside of the protective ceramic sleeve).
Started to glaze all remaining bisque pottery to be included in a inventory glaze firing on Wednesday.
Saturday, 5/14/2022
Finished glazing and loaded the Bailey kiln mostly with the remainder of the Lawai order for a glaze firing tomorrow.

Friday, 5/13/2022
Took a load of pottery to the VAC Gallery.
Two Corelite kiln shelves (12″ x 24″ x 1″) bought from Clay Art Center in Tacoma arrived in good shape via USPS.
Started glazing pottery.
Thursday, 5/12/2022
Finished forming the slab wall vases.
Unloaded the Bailey bisque kiln and sanded the pottery.
